SPEEDWORM: Swift, Portable, and Efficient Electrical undergrounDing using a Waterfree, cOmpact, and Reliable Machine
Technology Description:
GE Vernova Advanced Research is developing a robotic worm tunneling construction tool that would dig and install conduit and cables for underground distribution powerlines in a single step. GE’s SPEEDWORM would mimic the natural movement of earthworms and tree roots to install 1,000 feet of cable and conduit in two hours with unmatched flexibility. The tool could deploy from a standard pickup truck and would eliminate the cost, complexity, and surface disruption compared with conventional approaches.
Contact
ARPA-E Program Director:
Dr. Philseok Kim
Project Contact:
Mr. John Lizzi
Press and General Inquiries Email:
ARPA-E-Comms@hq.doe.gov
Project Contact Email:
lizzi@ge.com
Related Projects
Release Date:
03/30/2023